Soil Investigations At The Installation Location

Lynn_Barge_CPT_Oostende

NEMOS successfully performed an in-situ soil investigation at the planned installation location near the Port of Ostend. The Cone Penetration Test (CPT) was performed using the Lynn barge from contractor Artes Depret, which carried a 20 ton CPT rig from SGS Geotechniek. The results of this test will be used to verify the stability of the research structures' foundation.